Friday, November 17, 2017

Shop Cement

One of the very first improvements we made to our new house here was to put a cement floor in the shop. When we moved in the shop had a gravel floor and was divided into three areas:  the main shop, the "office", and the "tack room". These were rooms that the previous owner had plans for and had started to create but never really finished. The office had a plywood floor, and the tack room had cinder blocks everywhere, possibly in preparation to put a plywood floor in. There was very little electrical done, though wires had been run all around the two smaller rooms, with outlet boxes. There was only one plug in the office that had a pull chain light attached. The tack room had empty outlet boxes and wires going here and there. The only lighting in the big shop was two lights that shone straight down. They weren't very bright either.


The day came when the guys started to work on the shop. We decided to do the main shop first and once we tore the office and tack room out we would do that side. But that was for later. 

The plan was to do it in two pours. 







 The first side is done.

Then they came back and did the same thing to the second side. The shop side, or 2/3 of the entire floor was now done.  

Eventually we would rip out the walls to the office and the tack room, creating one large space. I don't have pictures of that but here is a picture of the finished floor and the new lights above.


It's been a huge improvement!

Wednesday, November 15, 2017

Paint Choices

I know these posts aren't exactly in order but this is what I'm working on now. 

We recently and finally got the wall removed between the dining area and the living room. It was quite the ordeal. We had several bids ranging from $1600 to $5000!  We chose one guy but it took him forever to get started. He seemed hesitant to do it because it was a supporting wall and we needed a beam to hold the weight. The most complicated thing about it was there were some pipes above that needed to be moved (only a little) to make way for the beam. Our contractor ordered the beam and still kind of kept putting it off. We got the distinct feeling that he was uncomfortable with the project. Finally we told him he didn't need to do it because we knew he was very busy and had a million other projects he was working on. I'm sure he could have done the job, but he actually seemed relieved that we fired him.

Our electrician came back in to put some more can lights in the dining area and living room. When he saw the opening still wasn't done he called a buddy of his who came out and said he could do it. He got to work the next day and within a couple of days the wall was gone and the beam was up. Yay! Then the wallboard went up and now it is time to paint the areas.

I already know what tile I want to use for the floor so I got two samples. One was a brownish grey and the other was a more whitewashed grey wood look porcelain tile. The floor may be a while before it's done but I wanted to make sure the paint coordinated. 

The paint on the living room walls now is a very gross dirty mustard. The kitchen is a medium green. Now that the wall is gone the new paint is going to be one color throughout.

I learned from painting our other houses (and innumerable hours of DIY tv) that you need to take your time in picking out a paint color. The color will look different on different walls and during different times of the day. Also it will not necessarily look like the small chip once it's on the wall.

I got several sample jars and painted big squares on two opposite walls, and a section near the floor where I placed the sample tiles I had purchased.

We decided the tile on the left is too whitewashed looking (sorry Joanna Gaines). I liked the left tile because it looked more realistic to me and it had both brownish and grayish tones.  I actually thought we would go with one of the top four paints, but after putting them on the wall I knew right away they were too dark.  I went back and got four more samples the next day. Definitely better. The consensus was unanimous. We all decided to go with the second from the left on the second row. It's a Behr paint called "dove". It's not too dark, not too light, and goes well with the tile.

This is the opposite wall. You can see how the colors look different. They are in the exact same order as in the photo above.

I guess I'm going to be pretty busy this week.

Monday, November 13, 2017

Love Is In The Air

I looked out the window and saw a nice buck just strolling by. We haven't seen a lot of deer this close to the house lately, probably because the dogs are out a lot.

He seemed to be focused on something near the garden. Then we saw a doe meandering through. Now it makes sense. It is that time of the year, after all.



 Somebody made a noise and they looked over.

Time to leave.

Friday, November 10, 2017

Master Bathroom Remodel

When we bought this house we knew it wasn't perfect. The problem was we had looked for so long to find something livable and within budget. We were getting tired of looking and we were losing hope that we would find anything that we could both agree on. He was all about the house, and was definitely not into any sort of diy remodeling, and I was not so fixated on the house but I insisted on getting some decent land. We had looked at this house the last time we lived here (before we moved to Prineville) but they wanted too much money at that time. We moved back to Roseburg and started our search again. After listing and delisting the house was listed again with a new realtor for a lower price. This time we made an offer and we got it.

One of the first things I wanted to do was fix the master bathroom. To me it was one of the most hideous things I've ever seen. It had a large double headed shower (no tub--I have to have a tub!) with glass block walls. Several of the blocks were cracked and even had mold and algae growing inside the blocks. There must have been a leak in the shower pan at one point because the floor tiles were uneven and not slanted properly toward the drain. Another clue to the leak problem was directly below, in the ceiling of the living room, was a patch of paint that didn't quite match the other ceiling paint.

The double sinks were nice but they are colored and I'm not really into colored sinks. Also the antiqued brass fixtures are not my thing.

The floor was not bad, a tile-looking vinyl that wasn't in too bad of shape. I'm guessing it was replaced when the leak in the shower floor was "fixed".

Finally the toilet was also in good shape. At least it's white.


The before pictures.



Ugly pinkish tile.




After we'd been in the house for a couple of months I decided to start looking for a home equity loan. I wasn't even sure if it would be possible to get one since we hadn't been there all that long. But on the other hand why not? We had a large down payment so really, the cash was there, in the house. And we were going to make the house more valuable with the improvements.

I checked with several banks and credit unions. Most would not touch it because it was "too rural", it was "more than 20 acres", or whatever else. I finally got a "yes" from Wells Fargo. That was before I found out they were in hot water from allegedly taking out loans in people's names without their knowledge. I was a little leary after learning that info but figured now that they were under the microscope they wouldn't dare do anything fishy.

I needn't have worried because everything went smoothly. We got our HELOC loan and started making improvements. I usually tell people the logging we did paid for the master bathroom. In reality we pulled money from the HELOC since it was readily there and I repaid it with the logging money.

We had a few contractors come out to give us a bid after we told them what we wanted. There is an interior design store here that gave us a great presentation, with a plan and sample materials. They weren't the least expensive but we decided to go with them. 

We took their first plan home with us to make measurements. They had a separate shower and my beloved soaking tub, but it turns out that left only a tiny space for the double sinks and counters. We went back to the drawing board and another plan emerged where the shower and tub were in the same space. That worked out much better.

A start date and schedule was set.  I have to say they pretty much stuck to schedule and there were only a few glitches.

The after pictures.

The bathtub/shower. The green tape is where they had a few minor fixes.

The only thing that stayed was the toilet.

After everything was done I got the final bills. The major thing I didn't understand was how the project lady figured the bill. She had said they charge 15% over what their contractors charge. I did the calculations based on the bills she provided and it wasn't adding up. She had some cockamamie way of doing it using 85%. Her figures were coming out higher than mine. We finally got it figured out and we ended up doing my way.

I love my new master bathroom. I love the tile, the deep soaking tub, the soft close cabinetry, the granite.  

The master bedroom was next.